← All countries East Africa

Tanzania

The East African story that Norway built. Equinor has been here 19 years. The appraisal wells starting now will define the next decade.

The country today

Tanzania's 63 million people are anchored to a $150 billion nominal GDP. President Samia Suluhu Hassan is pushing for Tanzania LNG FID by June 2026. Equinor leads the consortium at 35% with Shell at 25% and ExxonMobil at 20%. Equinor has been Block 2 operator since 2007 across 57 Tcf of proved reserves.

Energy — oil and gas

Tanzania LNG is a $42 billion project — FID targeted H1 2026, first gas H2 2034. Two LNG trains with 10–12 Mt/yr capacity. Appraisal wells are being drilled now — high water cut, heterogeneous pay, low pressure. This is where advanced completion technology fits.

The blue economy

Lake Victoria yields roughly 350,000 tonnes per year. The Mafia Channel artisanal fishery is high-value for prawns and grouper. Aquaculture targets 50,000 tonnes/yr by 2030. Dar es Salaam is East Africa's largest container hub at 5.5 million TEU/yr.

The Norwegian corridor

Norway's embassy in Dar es Salaam opened in 1961. Equinor's Block 2 operations and Tanzania LNG consortium role make Norway the energy partner. Fish for Development is active and substantial at NOK 100–150 million annually.

What Saga sees

Saga's single highest-probability East African engagement. Tanzania LNG appraisal wells in thin, high-water-cut pay present a textbook tight-gas opportunity. FID is expected H1 2026, meaning appraisal drilling is greenlit within 6–12 months. Equinor is the operator-lead with 19 years of history.

How we work

Saga is in Tanzania 3–4 times per year with standing technical relationships at Equinor's Dar es Salaam office, TPDC's upstream team, and Norad's Fish for Development coordination.

At a glance

Population
63 million
GDP
$150 billion (World Bank 2025)
Hydrocarbons
Natural gas; 57 Tcf proved reserves; Tanzania LNG FID H1 2026
Principal NOC
TPDC (15% Block 2)
Norwegian footprint
Embassy Dar es Salaam · Equinor Block 2 operator (19-year presence) · Norad Fish for Development
Saga focus areas
Lindi/Mtwara appraisal-well completion, Multilateral tight-gas stimulation, TPDC capacity-building, IUU detection and fisheries surveillance

Related intelligence